Structur

Start Free

Start Free

Build Estimates That Keep Money On the Job.

Cost codes, takeoffs, bids and markup in one estimate, then a proposal your client signs online.

No credit card needed. Instant access.

Estimates were built in Excel… hoping my team didn’t mess up my formulas. Bid requests to subcontractors were sent in emails while trying to track their responses in a spreadsheet. Proposals were created in Word and emailed as a PDF.

Jesse Lane, Founder of Structur, on running his construction company

  • Excel formulas
  • Bid requests by email
  • Sub quotes in a spreadsheet
  • Proposals in Word

So we built the whole flow into one place.

From First Number To Signed Contract.

Ballpark, takeoff, bids, estimate and proposal, in the order you work, with every number carried to the next step.

1Ballpark

Qualify the job before you estimate it.

Pick a complexity for each part of the job, add the square footage, and send your client a price range by email.

Ballpark sentBy email to your client
Price range$385,000 to $440,000
2Takeoff

Measure the plans once.

Set the scale, then measure lines, areas and counts on PDF or DWG drawings and send every quantity to your estimate.

Sent to estimateKitchen, 320 sq ft
PDF or DWGA-101 Floor Plan
3Bid Packages

See every sub’s number side by side.

Send a bid package by trade. Subs submit through a link with no account needed, and you level every bid by cost code.

No account neededSubs submit through a link
Lowest bidRidgeline Electric, $9,800
4Estimate

Build it line by line.

Cost codes, saved items and templates, with internal markup on each line and overhead, profit and tax on the whole estimate.

Internal markupOn each line
Saved itemsAnd templates
5Proposal

Get it signed online.

Send a branded proposal. Your client approves, declines or asks for edits from the link, and signs on screen.

Proposal approvedTotal $48,530
Signed on screen10/14/2026

One Missed Scope Item Can Cost Nearly a Third Of Your Profit.

On a $500,000 job at 20% markup, your margin is $100,000. Miss $30,000 of scope and it’s $70,000. In Structur, every line carries its own cost code, scope and markup, so the number that goes out is the number you meant.

Margin$500,000 job at 20% markup
As estimated$100,000
After one missed $30,000 scope item$70,000
−$30,000
−30%

That’s 30% of the profit on the job, from one line.

Everything Your Estimator Needs.

The details that make an estimate fast to build and hard to get wrong.

  1. Standard Cost Codes

    About 4,000 standard cost codes in five types: labor, material, subcontractor, equipment and other. Add your own, or import a CSV.

  2. Saved Items And Templates

    Save a line or a whole group once. Start from a template, or import a kitchen and a bath into the same estimate.

  3. Groups And Lump Sums

    Organize lines into groups and subgroups, and price any line as a lump sum with its own internal markup.

  4. Allowances

    Mark a line as an allowance when the price isn’t final yet. Your client still sees it on the proposal.

  5. Revisions

    Revise an estimate instead of starting over, or keep separate estimates for preconstruction and construction on one project.

  6. CSV Import

    Bring an estimate in from a spreadsheet, with every line’s cost code, description, quantity, unit cost and markup.

  7. AI Estimate

    Upload drawings or describe the job, fill in what the AI asks for, and review an estimate with cost codes, groups, amounts and descriptions. It runs on AI credits.

Estimates

Your Estimate Becomes the Budget.

When your client approves the proposal, the lead becomes a project and every cost code lands in the budget, ready to track against actual costs.

ProposalJones Kitchen Remodel
Proposal SentApproved
Labor$12,400
Material$18,650
Subcontractor$9,800
Overhead and profit$7,680
Total$48,530
LeadProject
BudgetJones Kitchen Remodel
Project
Cost codeCostsBudget
Labor$12,400
Material$18,650
Subcontractor$9,800
Overhead and profit$7,680
Total$48,530

Change Orders

Change orders pull their lines straight from the budget.

Kitchen island added$2,450Approved

Subcontracts

Award a sub’s bid and turn it into a subcontract in two clicks.

Subcontractor$9,800Award BidSubcontract

Invoices

Invoices bill against the same cost codes, with QuickBooks Online on the Pro plan.

Invoice #1042$13,500Paid
QuickBooks OnlineSynced

Estimates Questions.

Yes. Every account comes with about 4,000 standard cost codes in five types. Add your own by hand, or import them from a CSV, including CSI format codes.

Want to see it on one of your jobs?Book a demo and our team will walk you through it.

Book a Demo

Discover More From Preconstruction.

Send Your Next Estimate From Structur.

Start free. No credit card needed.