How To Run And Document A Toolbox Talk
A toolbox talk is a short weekly safety meeting on one job-specific topic. How to run one, check if it's required, and keep a signed, dated record.
A toolbox talk is a short weekly safety meeting your superintendent runs with the crew at the start of the shift. Each one covers one topic that fits the risks on that job right now. Everyone on site signs an attendance sheet, and the signed record gets saved where your superintendent can pull it up later.
Do you have to hold toolbox talks?
That depends on where you work, so check the rules in your state and city first. Some states write them into their construction rules. California requires construction supervisors to hold them at least every 10 working days. Washington requires crew safety meetings at least weekly.
They matter most on larger projects and commercial construction. If they're required where you work, give your superintendent a process and let him know it's part of his job.
How do you run a toolbox talk?
Pick a different topic each week, one that fits the work happening on the job. Prepare a few key points, and maybe one quick example from the site.
Gather the crew at the same time each week, with everyone there and tools set down. Stand them in a circle where they can all hear.
State the topic and why it matters, then cover the key points. Show the safe way to do the work. While the whole crew is standing there, clarify what you expect from them today.
Keep it short so you're not burning a bunch of time. Then document who attended, collect the signatures and note any corrective actions.
Follow up through the week. If the same issue keeps showing up, run that topic again until the crew gets it.
How do you keep the record?
Every talk needs a signed record with a date on it. A paper sign-in sheet works fine for the signatures.
Structur has an SOPs area where you write your own processes, organized by department. Write your toolbox talk process as a page in the department your field team uses, and add a form to it.
Give the form fields for the project, the superintendent, the date, the topic, the key points and the attendees. Add a file upload field too, so he can snap a photo of the signed sheet and attach it.
The SOPs are in the Structur mobile app, so your superintendent fills in a new entry from his phone on site. Every entry is listed in Structur with its date. When someone asks for the records, he can pull up each toolbox talk he's run.
How do you make toolbox talks stick?
Sit down with your field team and go through the process together, with the page open in edit mode. If a superintendent has a good idea, write it into the standards right there. You'll get a lot more buy-in when your supers help shape it.
Then hold them to it. If a superintendent skips his toolbox talks, log it in a correction log, the same as you would for skipped daily logs.
Tonight, pick next week's topic from the work starting on that job. Then have your super run it at the start of the first shift.
More From The Blog
How To Price Your Superintendent And PM Into A Bid
Your superintendent and PM are a cost of the job. Price them by the week in general conditions, on their own lines, and the client pays for them.
Read the post 3 min readStandard operating proceduresWhy Your Team Ignores The SOPs You Wrote
Writing your SOPs is hard. Getting your team to follow them takes a rollout: a walkthrough, a quiz they sign off on and a weekly scorecard.
Read the post 3 min readCost code managementHow To Code A Supplier Statement For Job Costing
Split every supplier statement line by line to the job and the cost code. One materials line can't show you what any part of the job cost.
Read the post 2 min read