How Many Jobs Can One Superintendent Run?
A superintendent might carry four or five small residential jobs, but on larger, more complex work he really shouldn't run more than two at a time.
On smaller residential jobs, like kitchens and bathrooms, a superintendent might carry four or five at once. It's easier when those jobs are near each other. On larger, more complex jobs, he really shouldn't be running more than two at a time.
Ideally you'd have one superintendent per project. Your project manager is the one who carries several jobs, and he manages several superintendents. Each super's job is the site in front of him.
Why does location matter so much?
I once had a superintendent running three commercial buildouts, each around four or five hundred thousand dollars. The jobs were across town from each other. He was driving to the north side, the south side and the west side.
He burned out. The subs started telling me he was just sitting in his truck. Eventually he quit, the projects turned sour, and I had to bring on a whole new superintendent.
A superintendent has to be on site to run the job. When his jobs are spread across town, he spends his day driving between them.
What does one job ask of a superintendent?
Each morning starts with a full walk of the site. He checks signage, safety fencing and the porta-potty. He confirms every sub is following safety protocols like PPE, cord placement, ladder use and fall protection. He checks deliveries, records manpower by trade and confirms which subs are coming tomorrow.
During the day he walks the site again to check progress, answers field questions and documents changes. Before he leaves there's one more walkthrough for cleanup, and then the daily log.
Your superintendent has to submit a daily log every day. That's why it's called a daily log.
Structur's daily log comes with default questions for work progress, manpower, materials delivered, delays, inspections and the look ahead. Photos and videos go in too. He can fill it out in the mobile app on site. When the project has an address, he can add the weather report to it.
Picture doing all of that on three jobs across town from each other.
How do you know a superintendent has too much?
You want to see it on his scorecard before a sub has to tell you. The field scorecard tracks things like daily logs submitted on 100% of workdays and daily checklists completed. It also tracks schedule adherence and inspection pass rate. When a superintendent is spread too thin, those are the numbers that slip first.
Structur lets you add a scorecard to the field management SOP page you build for your supers. You look at it each week in clear red and green. Write your capacity rule on that same page, so the standard is on paper for everyone.
This week, put each superintendent's jobs on a map and ask him how much of his day goes to driving. Do that before you hand him the next one.
More From The Blog
How To Run And Document A Toolbox Talk
A toolbox talk is a short weekly safety meeting on one job-specific topic. How to run one, check if it's required, and keep a signed, dated record.
Read the post 2 min readEstimatesHow To Price Your Superintendent And PM Into A Bid
Your superintendent and PM are a cost of the job. Price them by the week in general conditions, on their own lines, and the client pays for them.
Read the post 3 min readStandard operating proceduresWhy Your Team Ignores The SOPs You Wrote
Writing your SOPs is hard. Getting your team to follow them takes a rollout: a walkthrough, a quiz they sign off on and a weekly scorecard.
Read the post 3 min read