Should A GC Subcontract Every Trade?
In-house crews come with vehicles, gas and insurance. Subbing out most trades turns your company into a management company that can grow past ten million.
Sub out as much of the work as you can. For most general contractors who want to grow, that's my answer. You don't have to sub out every trade. But the more field work you keep in house, the longer it takes you to step up and run the whole company.
I think subcontracting is how a GC gets past the ten million dollar mark. A lot of guys get stuck thinking their next hire is another carpenter. When the trades are subbed, you can build a management company and actually work like a GC.
What did I do at my own company?
I didn't run in-house labor. We did commercial work and I subbed everything out. My in-house staff was pretty much all management: project managers, superintendents, an office manager, an estimator, a sales guy, a COO and eventually a CEO. I scaled that company to over fifty million in revenue.
Why do in-house crews make it harder to scale?
One of the contractors in our mastermind put it this way on a call. It's easier to grow and scale when you sub out most of your trades. Otherwise you've got vehicles, gas, insurance and so many expenses that it's hard to scale.
He subs out almost everything. He has one field tech who goes out and does punch-out work. He also has two full-time cabinet painting techs, because cabinet refinishing is how his company started seven years ago.
Every other trade goes to a sub base he built, with a system for how he pays them. He told us subbing it out was the only way they got to where they're at today.
What if you want to keep a crew in house?
You can. I'm not saying everybody has to sub out everything. But if you keep a whole team in house, you still need a layer of management above them. So I'd build that layer first.
What does a GC do when the trades are subbed?
You market, you sell, and then you deliver the project by recruiting the best subs you can find. That's most of the job.
Your reputation matters a lot here. Paying on time and running organized jobs is what makes good subs want to work with you.
Every sub you bring on goes into Structur as a vendor, tagged by trade, so the sub base you build sits in one list.
Structur shows each subcontract under its cost code in the project budget. When you create a bill against it, that amount moves from the subcontract balance to bills. So you can see what you still owe each sub on that job. A sub can also request a payment from the same link he used to sign his subcontract.
If your next hire was going to be another carpenter, look at hiring a superintendent first.
More From The Blog
How Much Are Systems Worth When You Sell?
Two contractors with the same three million in revenue and the same profit can sell for very different prices. The one with documented systems is worth several times more.
Read the post 2 min readOrg chartWhy Does Your Team Still Call You?
Every interruption points to a system or checklist that isn't there yet. Draw the full org chart, put your name in every box you fill, and build those first.
Read the post 2 min readLeads pipelineHow Many Marketing Channels Does A GC Need?
Buyers need seven to eleven touch points before they call you, which is why a single marketing channel almost never produces work on its own.
Read the post 2 min read